a. To calculate the control limits for the mean chart:
Upper Control Limit (UCL) = Central Line + 2.66 x Range = 8.50 + 2.66 x 0.31 = 8.50 + 0.83 = 9.33
Lower Control Limit (LCL) = Central Line - 2.66 x Range = 8.50 - 2.66 x 0.31 = 8.50 - 0.83 = 7.67To calculate the control limits for the range chart:
Upper Control Limit (UCL) = D4 x Range = 2.114 x 0.31 = 0.656
Lower Control Limit (LCL) = D3 x Range = 0 x 0.31 = 0b. The process capability index is calculated as Cpk = min[(USL - X̄)/(3σ), (X̄ - LSL)/(3σ)], where USL is the upper specification limit, X̄ is the mean of the process, LSL is the lower specification limit, and σ is the standard deviation of the process.USL = 8.50 + 0.25 = 8.75
LSL = 8.50 - 0.25 = 8.25
X̄ = 8.50
σ = 0.13Cpk = min[(8.75 - 8.50)/(3 x 0.13), (8.50 - 8.25)/(3 x 0.13)] = min[1.92, 1.92] = 1.92Since the process capability index is greater than 1, the process is capable of meeting specifications at a four-sigma level.c. Since the process is capable of meeting specifications, the percent of the output that will fall outside the specification limits is zero.
Автор:
jesset9nbДобавить свой ответ
Предмет:
Русский языкАвтор:
taylor83Ответов:
Смотреть
Предмет:
ИнформатикаАвтор:
doogieyg20Ответов:
Смотреть